Tooting Primary School Learning Landscape

UPB are working with Tooting Primary School to rethink their school playground. The school is located on a constrained urban site, and the existing playground is too small for the school’s needs. Our primary challenge is to increase the size of the playground within its current footprint, and to increase the presence and experience of nature.

The ‘Learning Landscape’ comprises three main elements:

  1. A carpet of natural landscape elements which hugs the perimeter of the building at ground level, including raised planting beds, sitting areas, amphitheatre, a pond, and a play-mound with slide and tunnel.
  2. A two-storey timber-frame external classroom, which includes a covered outdoor learning space, with a green-roof terrace above.
  3. A three-storey timber-frame play structure, with three levels of play-decks linked by staircases, ladders, climbing nets and a fireman’s pole.

We worked closely with the school community to design the Learning Landscape collaboratively, and hosted design workshops with the school students, and co-design sessions with parents and teachers.

0075
Tooting Primary School Learning Landscape
Wandsworth, London
Complete, 2019–2022

Client

Tooting Primary School

UPB Team

Alex Warnock-Smith, Project Director
Yonatan Buchhandler, Project Architect

Project Team

Duncan and Grove, Main Contractor